| Administration
Building Walls |
 |
| Inside
the Administration Building |
| 
|
| Support
building looking at medical/dental area |
 |
| Support
building looking at laundry and intake areas |
| 
|
| Support
building looking at Administration building |
| 
|
| Subgrade
of Housing building #1 |
| 
|
| Bundle
of security conduit from the Admin bldg to Housing bldg
#1 |
| 
|
| Masonry
wall at the administration building
|
| 
|
| Eastern
view into the central control room
|
| 
|
| Northern
view into the central control room
|
| 
|
| Plumbing
for housing unit 1 |
| 
|
| Housing
unit 1 footings are ready to receive tilt-up panels
|
| 
|
| Preparation
for pouring housing unit 2 footings |
| 
|
| Slab-on-grade
prep for laundry and intake in building P |
| 
|
| Slab-on-grade
pour for medical and dental in building P |
| 
|
| Slab-on-grade
prep for visitation area and kitchen in building P |
| 
|
| Segregation
building ready for P.C. cells |
| 
|
| Steel
set for the Control Room |
| 
|
| Steel
erected for the Power House |
| 
|
| Final
pour for the Support building |
| 
|
| The
core of K building |
| 
|
| The
recreation building walls are going up. |
| 
|
| The
Utility building is nearly complete. |
| 
|
| The
warden’s office inside the Administration building
prepared to receive drywall. |
| 
|
| The
main entry into the facility. |
| 
|
| The
masonry and steel framing of the Recreation building. |
| 
|
| Developing
the rifle range for correctional officer training. |
| 
|
| The
main bearing steel set in preparation for the installation
of perimeter wall. |
| 
|
| The
walls to P-building go up at a rate of approximately
three per hour. |
| 
|
| P-building’s
walls go up quickly. |
| 
|
| Installing
the remainder of the P-building walls was completed
within several days. |
| 
|
| The
steel trusses supporting the walls of P-building are
installed. |
| 
|
| Installing
the roof in the Recreation building continues. |
| 
|
| A view
of the construction site from a distance. |
| 
|
| |
Groundwork
on lower site (October 2005) |

|
Landscaping
near Administration Building (October 2005) |

|
Arrival
of FF&E in Dining Room (October 2005) |

|
Parking
lot and Administration Building (October 2005) |

|
Perimeter
Road (December 2005) |

|
Administration
Building (December 2005) |

|
Facility
Building (December 2005) |

|
Firing
Line (December 2005) |

|
Firing
Range (December 2005) |

|
Center
Compound (January 2006) |
 |
Housing Dorm (January 2006) |
 |
Front
Entrance (January 2006) |
 |
Gymnasium
(January 2006) |
 |